Two major highway routes around Ann Arbor will see new pavement this summer as a result of Michigan Department of Transportation construction.
Angela J. Cesere | AnnArbor.com file photo
M-14 in both directions between the tri-level interchanges on the north side of Ann Arbor also will be resurfaced, Arend said. The interchanges themselves are the endpoints for the project.
The projects likely will begin in July and may require off-peak lane closures on nights and weekends, Arend said.
The resurfacing projects are just a portion of what MDOT is planning for the 2013 construction season.
A full list of MDOT construction projects for 2013 will be released in March.
During the summer of 2012, MDOT resurfaced U.S. 23 from Washtenaw Avenue to M-14, which required lane closures during weekends.
M-14 from the U.S. 23 interchange to the Wayne County line also was under construction as MDOT completed a repaving project last summer.
View 2013 MDOT road construction in a larger map
Amy Biolchini covers Washtenaw County, health and environmental issues for AnnArbor.com. Reach her at (734) 623-2552, amybiolchini@annarbor.com or on Twitter.